• meco03211@lemmy.world
    link
    fedilink
    English
    arrow-up
    14
    ·
    18 hours ago

    Except there wouldn’t be such concern over water consumption for terrestrial based data centers if it was some arbitrarily middling to low heat output. They consume controversial amounts of water because they put out tons of heat. If they have to go to such great lengths here on good ole planet earth to keep this shit cool, I need a little bit more than “it can be done”. I understand that it’s theoretically feasible. Is it realistically feasible though?

    • NotMyOldRedditName@lemmy.world
      link
      fedilink
      English
      arrow-up
      6
      arrow-down
      3
      ·
      edit-2
      17 hours ago

      It is realistically feasible. They’re going to build custom chips that allow them to run constantly around 90c or higher if i remember correctly. That allows them to run the radiators at a much higher temperature than the ISS which needs to support human temperatures. I won’t trust the numbers SpaceX puts out on the size of the radiators until they actually do it, but they’re claiming the radiator will be 110m^2 and be able to handle 120kW of average heat. On the Kevlin scale (not celsius), a higher temperature works to the 4th power at reducing the size required, so every degree they can run hotter really helps reduce the size.

      Edit: for reference, they already deploy solar arrays on the V3 satellites bigger than their expected radiator size.

      Edit: Feasible doesn’t mean profitable either.

      Edit: The radiators will be double sided as well, so 2 cooling loops not 1.

      • azuth@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        1
        ·
        7 hours ago

        Of course SpaceX/Tesla is going to manufacture more robust chips than currently on the market despite being a newcomer.

      • meco03211@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        17 hours ago

        I was including profitable in feasibility. That’s one of my biggest hangups on this. The other is potential for Kessler Syndrome.

        • NotMyOldRedditName@lemmy.world
          link
          fedilink
          English
          arrow-up
          1
          ·
          17 hours ago

          ya, profitability is a whole other matter if that’s part of feasibility. Not only does it need to physically work as expected, but it also has to be at a reasonable cost AND earn enough money from people actually wanting to use it, and who the fuck knows if that will ever be possible.

          I did write this other comment about Kessler though

          https://lemmy.world/post/54847200/27050416